Tm 2922
For shunting and construction work in Gletsch
The Tm 2922 was taken over by the MGB in autumn 2014. It replaced the Tm 92, which had damage in the area of the hydrostatic drive. Thanks to the mounted hydraulic crane, the Tm 2922 is ideally suited for shunting and construction work in Gletsch.
Do you like this story?