Steffenbach Bridge

dfb Logo

Background data about the Steffenbach Bridge

Construction: 1925 by TH. Bell & Comp. from Kriens

Lenght: 36.24 m

upper part of the bridge (Furka side): 11.65 m

center part of the bridge: 13.29 m

lower part of the bridge (Realp side): 11.30 m 

Construction details: 3 openings with articulated skew supports (truss bridge)

Gradient: 110 %o

Clearance below: about 18 m

Weight of the steel: 32 t

Start of operation: 25.8.1925

First assembly by the DFB resp. the society of the Furka Mountain-line: 1988

  • Position in winter

Events

  • Werbestand BE
  • Stammtisch Rh-M
  • Werbestand BE
  • VFB-NWCH 3 Königs-Treffen
  • Werbeauftritt ...
  • furkaSTAMM
  • Treberwurstessen
  • Stammtisch Rh-M
  • Werbeauftritt ...
  • HV 2020 Sektion Ostschweiz
  • show all...
Webcam

Archives

  • Werbestand BE
  • Nürnberg:Bauwoche
  • Infostand Rh-M
  • VFB-NWCH Mitgliedertreffen
  • show all...