Steffenbach Bridge

dfb Logo

Background data about the Steffenbach Bridge

Construction: 1925 by TH. Bell & Comp. from Kriens

Lenght: 36.24 m

upper part of the bridge (Furka side): 11.65 m

center part of the bridge: 13.29 m

lower part of the bridge (Realp side): 11.30 m 

Construction details: 3 openings with articulated skew supports (truss bridge)

Gradient: 110 %o

Clearance below: about 18 m

Weight of the steel: 32 t

Start of operation: 25.8.1925

First assembly by the DFB resp. the society of the Furka Mountain-line: 1988